Download Papers

Geoff Stafford and Robert McNaughton, Whiting Petroleum Corporation

When evaluating artificial lift in a CO2 flood, certain factors must be taken into special consideration. This statement is especially true if the reservoir is a sandstone without H2S. Such conditions exist at Postle Field in the panhandle of Oklahoma, making it a field of unique nature. Under normal considerations, when CO2 is injected, it mixes with water and produces a weak carbonic acid. If the reservoir is a carbonate, the rock will buffer the acid. If H2S gas is present, it also offers benefit and provides further buffer to the acid. At Postle Field, however, neither is
present.

Joe D. Clegg, Shell Oil Co.

Any fifty-minute discussion of artificial lift can be only an overview. It is impossible to cover the four major types -- rod pumping, electrical submersible pumping, hydraulic pumping and gas lift -- comprehensively in such a time frame. Nonetheless, I hope to give you a little better understanding of what the major considerations should be when selecting, designing, installing, operating, or repairing high rate artificial lift systems. For those who desire more information, I have prepared a bibliography of what I consider are the best published artificial lift papers.

Charlie McCoy, Permian Production Equipment Inc.

The method of artificial lift using the plunger lift system has been, until recently, the most overlooked and neglected of all the lift systems being utilized today. Why? For the most part, it has been misunderstood by operators, or in some cases operators have experienced failures due to antiquated systems, or misapplication on wells not suited to this form of lift. What form of artificial lift could be more efficient or economical than one which allows the energy produced by the well to produce the well? Plunger lift does just that.

Charlie McCoy, Permian Production Equipment, Inc.

The method of artificial lift using the plunger lift system has been, until recently, the most overlooked and neglected of all the lift systems being utilized today. Why? For the most part, it has been misunderstood by operators, or in some cases operators have experienced failures due to antiquated systems, or misapplication on wells not suited to this form of lift. What form of artificial lift could be more efficient or economical than one which allows the energy produced by the well to produce the well? Plunger lift does just that.

RHEOLOGICALLY STABLE DELAYED SET CEMENT SLURRIES, THEIR MODIFICATION AND ACTIVATION ON DEMAND

It can be beneficial to store generic cement slurries whose set times have been delayed for weeks, then modify the bulk slurry properties, such as density, and activate them just prior to conducting the cementing job. Such technology offers distinct advantages in situations when the storage space is at premium or bulk blending facilities are not located close to the job site.

L.M. Cenegy & G.W. Douglas, NL Treating Chemicals/NL Industries, Inc.

The presence of small amounts of free or emulsified oil or oil coated solids in produced brines can adversely affect the properties of that brine in waterflooding and enhanced oil recovery projects. Likewise, the disposal of such oily brines can present a problem if the brine is being injected into a tight formation or, in the case of offshore platforms, if the brine is being disposed of overboard.

Matt Cumings, Schlumberger WCP REDA, Saul Tovar, Oxy Permian, & Heather Gregory, Hy-Tek Coating

Between 1995 and I997 Oxy's South Wasson Clearfork Unit had experienced severe asphaltene plugging and some significant gas cycling from C02 flooding. An area of the field became known as Asphaltene Alley due to the high amounts of asphaltene plugging. With an aggressive program of chemical treating and paraffin cutting, failure frequency moved from I to .5 during this period. In 1997, due to the industries economics, the C02 flooding was reduced from 25 mcf to 5 mcf for the 98 producers in this field. As economics improved Oxy planned to resume C02 flooding in the second quarter of 2001.

Jasen Gast, Enventure Global Technology, L.L.C.

With over 1,000 installations, solid expandable tubulars have established a legacy as an enabling technology that mitigates a variety of unfavorable wellbore conditions without sacrificing hole size. In addition to the technical solutions, operators have realized significant savings by being able to conserve on pipe needs, consumable use, and environmental disturbance. Incorporating these systems into the initial wellbore plan reduced overall costs of some wells by up to 30%. Projects previously deemed cost prohibitive gained economic feasibility.

Ray Sears & Dick Mocksfield, Halliburton Services

This paper discusses the use of a data acquisition system to provide higher quality cementing services at lower costs. Using low power microprocessors combined with reliable sensors for pressure, rate and density measurement of cement slurries the data gathered can be used to help prevent abnormal jobs, keep slurry density within program limits and provide system maintenance indicators.

G. Wayne Westerman, Automation Associates

More than ten years ago oil and gas producers expressed the need for a generalized system for the automation of well head operations. A well-head supervisory controller has been developed that provides a general, simple, small, low cost hardware platform with extensive firmware capabilities for well head automation. The operating firmware for the system is written in a high level language, which allows flexible application development at reasonable cost in a reasonable time. Communication for the system employs a widely used, well known, standard protocol.

Roy N. Moore & Kenneth J. Schmitt, Stren Company

Patented new technology was recently introduced to the petroleum industry that reduces the Ming cost per barrel of fluid by containing the spectrum of abrasive particles that damage the rod pump. This technology includes a stainless steel membrane system with specifically tailored micron rated openings. Production operators throughout the world continue to document dramatic economic benefits when a dedicated abrasive particulate control system is used to protect the crucial tolerance of the rod pump plunger to barrel interface.

John W. Cramer, P.E.

This paper will share the experience and information gathered from the installation and/or operation of over 500 Automatic Casing Swab (ACS) systems. The information provided will assist an operator to determine if a well might benefit from ACS technology . This paper will review the history of the ACS and its evolution to the present day proven dependable tool. A discussion of the operating principles of the ACS will illustrate the flexibility and wide ranging applications of the ACS system in many types of gas reservoirs.

Jack H. Edwards, Tenneco Oil Company

Liquid that accumulates in an air-drilled borehole after water-bearing zones are penetrated causes drilling problems that result in excessive compressor requirements and lost rig time. An automatic jet sub that aids removal of liquids that accumulate during downtime and helps lift slugs during drilling described. This device consists of a differential pressure valve mounted in a drilling sub. These subs are spaced in the drill string above the bit. A portion of the circulating gas is diverted to the annulus above the bit when required to lift liquid slugs.

Vernon B. Scott, Garrett Oil Tools, Inc.

Automatic lease operation fundamentally results in three basic factors which production operators always set up as primarily criteria for their operation: 1. Conservation of (a) hydrocarbon resources and (b) steel 2. Increased safety and efficiency of operating personnel 3. Reduction in initial capital investment. In order to get a clear picture of this new concept of lease arrangement, we should first break down into some broad categories the types of well production as well as the size and scope of individual leases.

E.F. Foreman, Jr., Southwest Control Company

The oil industry has utilized automatic controls and instruments for controlling processes and functions in the refining, natural gasoline and pipeline departments for a number of years. Only recently, though, have steps been taken to automate the handling of fluid and gas from the well head to the pipelines. Automatic lease installations now installed and operating have shown that the greatly increased economies and performance derived will provide tremendous momentum for full automation of oil and gas production.

J.K. Armstrong, Waukesha Motor Company

The types of installations that can be made automatic and a method of selecting the proper equipment are discussed. The complete operating cycles of some automatic gas engine installations are explained, including starting, loading, protection for both engine and equipment, unloading and stopping. Matching horsepower to required output by speed and/or load modulation, idle running and intermittent operation are covered.

Thomas A. Hill III, Director of Engineering Kimray, Inc.

Managing plunger lift operation with electronic control has the potential to radically improve the production of fluid loaded wells. For this improvement to be realized however, several factors must be taken into consideration, and the control system must meet certain minimum criteria. For a control system to be successful it must address the needs of the operator, provide the control requirements specific to the physical constraints of the well, and incorporate a flexible and complete control system to empower the operator to manage the process of plunger lift with intelligent tools.

W.B. Banks, Southwest Control Company

In competitive industry there has always existed a trend toward the application of automatic equipment. This trend has been stimulated by efforts to conserve two principal business elements; time and money. The inherent advantages of automatic methods over manual methods have been (1) higher degree of accuracy in control (2) greater speed of response (3) lower operating expense and in most cases, (4) lower initial investment.

Frank W. Beach, Cities Service Oil Co.

Cities Service has three automatic tank batteries, all of which use positive displacement meters. All of these batteries are unattended and automatic in operation. Oil is produced, monitored, treated and run to the pipeline without manual intervention. Although positive displacement meters are the heart of these units, there are other components just as necessary and important to automatic custody transfer (ACT) of oil to the pipeline.

S.L. Stentz, Stentz Equipment Co.

Emulsions (oil/water mixtures) have been known to exist since oil was first produced. The first early methods for dealing with this problem were to skim the oil from the top of a storage vessel and get rid of the rest by flowing it into streams or storage pits. The early refiners had their problems with handling crude oil containing water, because the expansion of a typical crude oil when heated to 700 degrees Fahrenheit is 60%, while water expands more than 1600 times (160,000%) as steam.

Michael Brock & Bill Trice, ARCO Oil & Gas Co.

ARC0 Oil and Gas Company's Willard Unit is located in the Wasson San Andres Field, Yoakum County, Texas. Waterflood operations began in 1965 with tertiary (alternating water-CO21 operations beginning in January, 1986 in the southern part of the unit. There are currently 335 producers, 270 injectors, 13 test stations, one central battery, and two water injection plants. Automation was installed first in 1973 and has progressed in three primary steps. This paper highlights that progression by discussing its utilization and results.

C. P. Findlay II and R. B. Herring. Conoco Inc., J. S. Pike. Delta-X Corporation

Conoco. Inc. operates the Dagger Draw field in Eddy County. New Mexico (see Figure 1). The field produces 2500 BOPDI8500 BWPDil 1000 MCFPD from 35 wells on beam pump. The typical well utilizes an API 87 high strength rod design with either a 912 or 1280 conventional pumping unit running 8-9 SPM with a 168" stroke length. The 7,900-ft reservoir is under primary development. A 30-month study is documented during which automated Pump-Off Controllers (POCs) were installed to reduce the high rod failure in the field.

Charles N. Smith, Phillips Pipe Line Company

The problem of increasing profits by decreasing cost has forced many innovations in all sections of the petroleum industry. The automation of its operations has been and will continue to be the major item in reducing cost. Automation means many things to each person, and there has been numerous papers presented covering each phase of automatic equipment. This presentation will be a general description of what one pipeline company has accomplished in its operations through the use of automatic equipment.

Wes Hall & Bob Moon, Pumps and Service

Finding effective, low cost prime movers for pumping units can be hard to acquire in today's market of deregulated electricity. The inability to adequately start and stop gas engines has always been a problem area. With the cost of electricity increasing, and the ability to operate wells when you want decreasing, the producer will have to take peak usage and availability of that electricity into consideration for their production cycles. The day may come when then electricity may dictate when the well operates and not the producer.

Annual Conference Info

NEXT SWPSC CONFERENCE: April 19-22, 2027