Planned Preventive Maintenance The Key To Lower Operating Costs For Engines And Compressors
Presenters: Leo S. Mitchell, Shell Oil Company
Plastic Coatings for Corrosion Scale and Paraffin Control in Oil Field Tubular Goods
Presenters: Barnard Goodman, Tube-Kote, Inc.
Plunger Lift By Side String Injection A Method of Producing Wells By Plunger Lift In Wells With Low Bottom Hole Pressure By Incorporating Supplemental Surface Injection Via Side String
Presenters: Jared C. Hall, Marathon Oil Company & Bruce Bell, Plunger Lift Systems, Inc.
Paper: Plunger Lift By Side String Injection A Method of Producing Wells By Plunger Lift In Wells With Low Bottom Hole Pressure By Incorporating Supplemental Surface Injection Via Side String
Paper: Plunger Lift By Side String Injection A Method of Producing Wells By Plunger Lift In Wells With Low Bottom Hole Pressure By Incorporating Supplemental Surface Injection Via Side String
Plunger Lift Optimization By Monitoring And Analyzing Wellbore Acoustic Signals and Tubing and Casing Pressures
Presenters: Jim McCoy, Lynn Rowlan, & Dieter Becker, Echometer Company & A.L. Podio, University of Texas at Austin
Plunger Lift Performance Optimized By Flow And Pressure Operated Control Systems In A Turnkey Installation
Presenters: T. Scott Campbell & Ron Gordon, Weatherford Artificial Lift Systems
Point-By-Point Calculation of the Time Variation of the Polished Rod Load in Sucker Rod Pumped Oil Wells
Presenters: Joseph H. Norton & John C. Paul, Oklahoma State University