Hydraulic Pumping and New Developments
Presenters: Clyde H. Lietzow, Lietzow Equipment Company

During the past eighteen years the hydraulic long stroke pumping unit has made an ever increasing entrance into the crude oil production picture. In 1939, two hydraulic long stroke units made their appearance in the oil fields. In the early days of the hydraulic unit, as is true with other new types of equipment, there was a great deal to be learned by the manufacturer's as well as the operators. Often the operator of the early hydraulic long stroke unit felt fortunate if he had a four or five day trouble free period. Nevertheless, the deep wells with high volumes presented problems to the producers which they realized had to be solved.

Show More
Paper: Hydraulic Pumping and New Developments
Hydraulic Pumping in Small Diameter Casing
Presenters: John T. Underwood, Kobe, Inc.

This presentation concerns the theory, design, and application of hydraulic pumping for deep single and multiple slim hole completions. More specifically, the operational problems that are inherent with this type of system will be discussed, along with the practical solutions that have been field tested and have proven successful.

Show More
Paper: Hydraulic Pumping in Small Diameter Casing
Hydraulic Pumping Systems Artificial Lift For Varied Lifting Requirements
Presenters: Howard Tair, Trico Industries, Inc.

The hydraulic method of artificial lift has traditionally offered creative solutions to operators faced with a wide array of producing problems. A long history of equipment and application development has brought today's hydraulic pumping systems to a status of unique adaptability to varied application requirements with reliable operating performance. This update on the capabilities of the hydraulic system will review system hardware and describe installation and operating characteristics which account for the versatility of this lift method. Examples of application flexibility are discussed, including installations for horizontal completions, hydraulic lift powered from the water flood injection plant, wireline set hydraulic pumps in existing wells and well testing.

Show More
Paper: Hydraulic Pumping Systems Artificial Lift For Varied Lifting Requirements
Hydraulic Unit Pumping For The Low Production Well
Presenters: Robert W. Reekstin, Axelson Division of U.S. Industries, Inc

This paper discusses new hydraulic equipment which reduces maintenance, increases simplicity at lower costs and improves operation. Presentation includes demonstration of a hydraulic unit installed on a "dummy" well-head, and placed in operation. The complete circuit is visible through use of clear plastic materials.

Show More
Paper: Hydraulic Unit Pumping For The Low Production Well
Hydraulically Actuated Surface Pumping Units
Presenters: Keith McDonald Bosch Rexroth

Hydraulic pumping systems have been around for a while now, but in the past they have underperformed against mechanical beam pumps. With improvements in drive and control technology, hydraulic pumping systems are now able to outperform beam units. They have achieve higher speeds without putting added stress on the rod string by optimizing the velocity profile of the actuator. Because the prime mover and actuator are mechanical linked on a beam pump, the velocity profile of the actuator is a sinusoidal; however, the prime mover and actuator on a hydraulic system are not physically connected, so the profile is able to be optimized. Additionally, their speeds and strokes can be easily adjusted with he push of a button, their footprint is much smaller, and there are no safety concerns because there are no external moving parts.

Show More
Paper: Hydraulically Actuated Surface Pumping Units
Hydraulically Operated Stage Cementer Improves Cementing Operations
Presenters: Austin Freeman & John Brandell, Halliburton Services

A recently developed hydraulically operated (HO) stage cementer has proven beneficial in cementing both vertical and horizontal wells. Although the tool was developed primarily to aid in cementing highly deviated and horizontal wells, its application in any situation calling for a stage cementer can be beneficial. 1. In operations where a free-fall opening pluq (bomb shaped) is normally used, the waiting time for free fall to the plug seat is eliminated, saving rig time and allowinq for continuous circulation of the hole. These cementers can be opened immediately, which is beneficial in those applications in which first stage cement is brought above the cementer. 2. If a displacement plug (pump down style) is normally used, the need is eliminated for excess cement in the casing to ensure that the first stage is not over-displaced, saving drill out time after cement is set. In this configuration, a positive check of float equipment for secure holding can be made. The cementer is designed to monitor annulus pressure and internal pressure. When internal pressure reaches a predetermined level above annulus pressure at the tool, the cementer opens and circulation begins for the second stage. The cementer is closed by a conventional closing plug. This paper presents discussion of HO stage cementer operation, options available with the cementers, job design , and results of actual job conduct using these methods.

Show More
Paper: Hydraulically Operated Stage Cementer Improves Cementing Operations
Hydrocarbon Vapor Recovery Systems
Presenters: Tom Hoge, C-E NATCO

With the trend toward more stringent clean air legislation moving at a rapid pace the industry may soon be faced with the problem of totoal vapor recovery. This presentation will review the types of equipment which have been developed to meet these requirements.

Show More
Paper: Hydrocarbon Vapor Recovery Systems
Hydrophobic Metal Lubricant Films New Solutions to Environmental Problems
Presenters: Gerald W. White, P.E., White Engineering Corp.

Hydrophobia, apart from the disease connotation, means fear of water. A Seldom mentioned fact of metallurgy is that there are "Hydrophobic" metals and alloys whose very nature is to resist wetting by water. As a corollary, these same surfaces aggressively wet with oil and will maintain themselves oil wet in an oil/water flow stream by attracting oil out of the flow stream while repelling water. Since mineral scale deposition comes from the water component and not the oil, there will be a tendency for it to aggregate in the flow stream and be swept out in the flow stream. Thus the system environment, being the oil/water mixture in the flow stream can be utilized to assist in solving scaling problems, particular at pressure drops and other scaling nodes. Examples will be presented wherein high energy ion deposited thin films of hydrophobic metals and alloys have been shown to resist scale formation while providing dry metal lubricity in a variety of actual installations. In many cases, the formation of scale on a moving rod operating through an elastomeric seal will cause the seal to fail, resulting in the discharge of fugitive emissions to the environment. It has been demonstrated conclusively in many field applications involving stuffing box rubbers and lease motor valve stems that scale can either be prevented entirely or have its adhesion reduced to the point where an elastomeric seal will rub it off. The cost of such films is quite low and the economic benefits to the users in terms of increased service life alone make their use cost effective even without regard to the far more valuable consideration of reducing the incidence of and clean up costs associated with releasing fugitive emissions.

Show More
Paper: Hydrophobic Metal Lubricant Films New Solutions to Environmental Problems
I HAVE AN IDEA. HOW DO I KNOW IT IS GOOD HOW CAN I PROTECT IT
Presenters: Fred M. Newman

Most folks in the oilfield are true experts in their field. They are, for the most part, good thinkers with original ideas that when properly conveyed bring value to both the inventor as well as the industry. Our industry needs new ideas. The majority of innovative ideas come when a person doing his/her job realizes there is a better way to accomplish a task. However, a good idea is nothing more than a dream until it is born. This paper deals with the capturing and documenting of ideas and what to do with them. Topics covered are: What is patent protection? How does one know if the idea is unique or novel or is patentable? How does one protect his/her idea? Who owns the idea? What are the general costs involved? When does one cross the infringement line?What web sites are available to help develop and protect one's ideas?

Show More
Paper: I HAVE AN IDEA. HOW DO I KNOW IT IS GOOD HOW CAN I PROTECT IT
I. Nyoman Hari Kontha, Sonny Irvana, Sumaryanto Soegihono and Krisjahbana Joenoes, VICO Indonesia, Jiten Kaura and Bastiaan Nieuwland, Halliburton Energy Services
Presenters: USING A PERFORATION PERFORMANCE MODEL (PPM) AND EXTREME UNDER-BALANCE (EUB) PERFORATING TO MAXIMIZE THE ASSET VALUE IN DEEP, LOW-POROSITY, LOW -PERMEABILITY GAS RESERVOIRS - A CASE STUDY

The extreme under-balanced (EUB) perforating technique has proven effective in deep, low porosity and low-to-medium permeability formations. The state-of-the-art scientific software for perforating performance modeling (PPM) can be effectively used in predicting the perforation performance in a wide variety of scenarios and to compare actual post-job details to make decisions according to economic benefits for various perforating techniques. As with any software modelling, a good grasp of the reservoir rock properties and fluid properties are essential as input parameters. The success of the EUB perforating performance and the capability of the PPM to successfully predict the well deliverability has increased confidence in effective candidate selection. Predictions from the PPM are within +/- 10% of the measured post-job results observed. The paper presents various cases that show how effectively and economically these deep sandstone formations can be completed to maximize the return on investment (ROI) and the rate of return (ROR).

Show More
Paper: I. Nyoman Hari Kontha, Sonny Irvana, Sumaryanto Soegihono and Krisjahbana Joenoes, VICO Indonesia, Jiten Kaura and Bastiaan Nieuwland, Halliburton Energy Services
Identification And Analysis Of Problem Wells In A Mature West Texas Waterflood
Presenters: Mark Fleming, Chevron USA Inc.

By compiling foreman's costs in a West Texas field, a method was determined for identifying problem wells and keeping a close liaison between field personnel and engineers in the office. Plots of marginal water and oil production as a function of both oil price and pulling costs were generated and used by field personnel and engineering for identifying unprofitable wells.

Show More
Paper: Identification And Analysis Of Problem Wells In A Mature West Texas Waterflood
Identification of Candidates for Massive Hydraulic Fracture Treatments in The Spraberry Trend
Presenters: Robert Barba Jr., Integrated Energy Services

The first hydraulic fracture treatments in the Sprabeny Trend consisted of 1500 gallons of refined oil carrying l/4 lb per gallon of sand. Since then, the average size of hydraulic fracture treatments has increased significantly to 180,000 gal of fluid and 432,000 lb of sand. The indication from a detailed characterization of the reservoir suggests that in certain cases an increase to over 900,000 lb of sand may be justified to maximize rate of return on investment. This should be combined with limited interval perforating and forced closure to ensure successful execution. Justification for these recommendations will be provided with an integration of the reservoir characterization and 3-D hydraulic fracture simulators.

Show More
Paper: Identification of Candidates for Massive Hydraulic Fracture Treatments in The Spraberry Trend
Identification of Sulfate Reducing Bacteria (SRB) And Their Role In Microbiologically Induced Corrosion On The M.F.E. Unit Operated By Fasken Oil And Ranch Ltd. Of Midland Texas
Presenters: Robert Cochran, Rob Cochran Consulting Inc., John Solansky, Endura Productions Corp., & Tommy Taylor, Fasken Oil & Ranch Ltd.

Wells are produced via rod/pump with generally an oil to water ratio of less than 1:4 being experienced. Under these conditions, it is generally accepted that a "water wet

Show More
Paper: Identification of Sulfate Reducing Bacteria (SRB) And Their Role In Microbiologically Induced Corrosion On The M.F.E. Unit Operated By Fasken Oil And Ranch Ltd. Of Midland Texas
Identifying Applications for Turbines in Drilling Operations
Presenters: Rocky Seale and Tim Beaton, Smith Neyrfor

In drilling applications the two most common drive mechanisms are rotary and the positive displacement motor (PDM), each of these having been employed for over a century. The theory behind PDM's is to increase the amount of mechanical power at the bit using the drilling fluid to generate power. This has proven to be a very efficient means of drilling.There is another drive mechanism that is commonly disregarded, the turbodrill. Turbodrills operate on the same principle as PDM"s, by using the drilling fluid to generate power to drive the bit. Having been used in the oil and gas industry since the 1950's the turbodrill is still relatively obscure and many applications where it could be used are simply overlooked. This paper provides the history of turbines, guidelines for identifying applications where turbines can be beneficial in the drilling operation, and recent case histories in the Rocky Mountains.

Show More
Paper: Identifying Applications for Turbines in Drilling Operations
Ignition Equipment and Procedures for Thermal Recovery Projects
Presenters: Jon T. Moss, T.O.R. Developments, Inc.

Ignition systems for initiating in situ combustion are reviewed with emphasis on electrical ignition and gas flame ignition. Related surface and down-hole equipment are discussed in detail, as well as the mechanical completion features of ignition wells. Typical ignition operations are discussed and techniques for detecting ignition are presented.

Show More
Paper: Ignition Equipment and Procedures for Thermal Recovery Projects
Impact of Pipeline Effkiency Improvement on Production and Reserve Estimates
Presenters: Mark Harmon, Mike Husband, and Gabino Tarango Jr., PPCO

A pipeline efficiency value of 90% is routinely used as a "rule of thumb" to estimate the production costs associated with gas-gathering systems. The 90% efficiency is appropriate for the development of new gas fields. However, conditions in mature or developing gas fields can dramatically reduce pipeline efficiency and gas-gathering system capacity. These conditions are often overlooked until a significant reduction in daily production has occurred. In order to understand the problem, field conditions that reduce the pipeline efficiency of a gas-gathering system are reviewed with respect to changes in gas production. A field study was performed to identify and correct conditions that reduce gas-gathering system efficiency. The impact of field conditions on line efficiency is examined through computer simulation. Finally, the field study is reviewed in order to show how an increase in line efficiency impacts production and reserves.

Show More
Paper: Impact of Pipeline Effkiency Improvement on Production and Reserve Estimates
IMPLEMENTATION OF A COMBINED LDHI AND PARAFFIN INHIBITOR PROGRAM PROVIDING COMPLETE FLOW ASSURANCE MANAGEMENT
Presenters: Jonathan J Wylde and Keith Allan Jonathan J Wylde and Keith Allan Clariant Oil and Mining Services, Clariant Corporation Clariant Oil and Mining Services, Clariant Corporation

The example is from a subsea infrastructure that was experiencing flow assurance challenges due to both hydrate and paraffin formation. The condensate had a paraffin content of 14.5 wt%. Paraffin control chemicals were being deployed with limited success. This paper gives a detailed description of the flow assurance root cause failure analysis in a Gulf of Mexico production system that was experiencing severe hydrate and paraffin failure. Details are given on the experimental work performed to develop new products, as well as results of the field applications. The paper summarizes the implementation and ongoing monitoring of this program in the field and provides lessons learned. Details on the cost savings created in reduced operations and chemical overhead for the operator are given, along with the value savings due to no lost production since blow downs were no longer required.

Show More
Paper: IMPLEMENTATION OF A COMBINED LDHI AND PARAFFIN INHIBITOR PROGRAM PROVIDING COMPLETE FLOW ASSURANCE MANAGEMENT
Implementation of Gelled Polymer Technology An Example of a Joint Industry-University Project
Presenters: Lanny G. Schoeling & Down W. Green, Tertiary Oil Recovery Project, University of Kansas

The Tertiary Oil Recovery Project (TORP) at the University of Kansas has been in existence since 1974. The Project is state supported and was established to conduct research on enhanced recovery processes which are applicable in Kansas and the Mid-Continent area. TORP has been investigating gelled polymer technology, which was developed to improve sweep efficiency in waterflooding and other displacement processes. The technology has been tested in several field pilot projects in the State. A number of these have been conducted as cooperative ventures between independent operators and the University. In this paper, the technology and its application in several fields are described. The manner in which the cooperative efforts have been undertaken are discussed.

Show More
Paper: Implementation of Gelled Polymer Technology An Example of a Joint Industry-University Project
IMPLEMENTING COULOMBS FRICTION FOR THE CALCULATION OF DOWNHOLE CARDS IN DEVIATED WELLS
Presenters: Victoria Pons-Ehimeakhe Weatherford

Currently downhole cards can be computed from surface cards by solving the one dimensional damped wave equation with finite differences and an iteration on the damping factor or dual iteration on the damping factors. The one dimensional damped wave equation only takes into consideration friction of a viscous nature and ignores any type of mechanical friction. However, when dealing with a deviated or horizontal well, the mechanical friction in between the rods, couplings and tubing is no longer negligible. In this paper, the modified Everitt-Jennings code is further extended to incorporate mechanical friction and accommodate deviated wells

Show More
Paper: IMPLEMENTING COULOMBS FRICTION FOR THE CALCULATION OF DOWNHOLE CARDS IN DEVIATED WELLS
Importance And Application of Field Data
Presenters: Dr. Harold A. Blum, Department of Petroleum Engineering, Texas Tech University

It is the purpose of this paper to (1) present a partial list of the types of data required and indicate their sources and applications and (2) to impress all personnel concerned with obtaining data that their work is extremely valuable since most calculations made by engineers and many decisions made by management are based on the reliability of their work.

Show More
Paper: Importance And Application of Field Data
Importance of Direction of Rotation of A Pumping Unit
Presenters: Joe Chastain, Manufacturer's Representative

Presents pumping unit geometrical and torque factors and how they are affected by direction of unit rotation. Permissible load calculations and diagrams are shown confirming conclusions.

Show More
Paper: Importance of Direction of Rotation of A Pumping Unit
Importance of The Proper Orientation Of Orfice Plates
Presenters: Herald Winkler, Consultant

Is the proper orientation of an orifice plate with a bevel important? The importance depends upon whether gas is being bought or sold. Volumetric gas rates were measured at two meter tube pressure levels using orifice plate bore sizes from l/2- through 1-l/4-inch in two 3-inch commercial meter tubes in series. The orifice plates were tested in the correct orientation with the sharp edge upstream and then reversed with the bevel upstream. The differences in the calculated gas rates for proper and improper orifice plate orientation are significant.

Show More
Paper: Importance of The Proper Orientation Of Orfice Plates
Improve Drilling Operations Control Drill Solids in Mud Mechanically
Presenters: C.L. Harvey, Baroid Division, N.L. Industries, Inc

Through the drilling industry's efforts to drill faster and deeper has come the application of three types of mechanical separators for processing drilling muds-the fine-screen shaker, hydrocyclone separator and the decanting centrifuge. These mechanical separators are necessary in today's drilling to maintain both low and high-weight drilling muds economically. With proper application, installation and operation, these machines can help reduce overall drilling costs by improving penetration rate and reducing mud treating costs.

Show More
Paper: Improve Drilling Operations Control Drill Solids in Mud Mechanically
Improve Profits Through Engineered Pump Station Design
Presenters: Charles R. Haberthur, Sun Oil Company

Proper consideration of all pertinent factors when designing a pump station, especially pump suction requirements, pays big dividends throughout the life of the project. Savings will be realized through increased pump efficiency and reduction of maintenance expense. This paper deals primarily with suction head requirements, suction and discharge piping and pulsation dampeners and is aimed particularly at reciprocating pumps; however, most of the engineering principles and practices described should be observed in the design of any pump installation.

Show More
Paper: Improve Profits Through Engineered Pump Station Design
Improve The Quality of Pump Protection and Pump Performance Will improve Dramatically
Presenters: Roy N. Moore, Stren Company

A new and patented technology has recently been introduced to the petroleum industry that reduces the lifting cost per barrel of fluid by containing the abrasive particles that damage the rod pump. This technology is a stainless steel membrane (screen), with specifically tailored micron openings. The membrane is engineered specifically to the pump manufacturers tolerance between the plunger and barrel under operators field conditions. A durable down hole pump protector can now provide more pumping days between workover cycles. Although experts agree that abrasive sand particles (frac sand or sand from the reservoir) will damage the rod pump, there has been little consideration given to understanding the micron size of particles that actually do the damage. This new technology includes a reusable stainless steel down-hole tool that allows the pump to do its work over a planned predetermined period of time with minimum damage to the plunger and barrel. Stren Company developed this special down-hole tool with a specific micron opening (15 to 75) micron) for containing the abrasives particles before they enter the pump. This engineered tolerance between the membrane and pump has proved to be the most economical approach to maximizing the pumping days for each well.

Show More
Paper: Improve The Quality of Pump Protection and Pump Performance Will improve Dramatically