| Title | Presenters | Topic | Paper |
|---|---|---|---|
| Field Evaluation Of ESP Motor Cooling Technologies Deployed In Multizone Permian Wells: Case Studies and Lessons Learned | Ala Eddine Aoun, Nelson Ruiz, Jesica Pfeilsticker, and Kurt Cole |
Artificial Lift, Electric Submersible Pump | |
| Field Evidence of Check-Valve Durability Under API Kickoff Gas-Lift Operating Conditions | Mike Juenke and Colton Oldham, Liberty Lift |
Artificial Lift, Gas Lift | |
| Field Optimization Reimagined: Data at the Core, Exceptions at the Center, People in Control | Mario Campos, Amplified Industries |
Prod. Handling | |
| Flowback Methodology (Slow Ramp, vs Open), Design and Timing of Installation of First Artificial Lift Method | Sofia Rodriguez,Bob L. Herd Department of Petroleum Engineering, Texas Tech University |
Artificial Lift, Gas Lift | |
| From Routes to Exceptions: Automating Plunger Lift Well Management | Jordan Portillo, Jeff Hartman, Brad Bowen, Kreg Flowers, and Tristan Nicosia |
Artificial Lift, Plunger Lift | |
| GALLOP into Late-Life Production: Extending Well Life by Unloading from the Lateral | Ryan Hieronymus, Oxy |
Artificial Lift, Gas Lift | |
| Gas Lift Optimization Achieved at Scale Through Automated Model Building, Automatic Model Tuning, and Application of Autonomous Control Logic Through an Enterprise Production Optimization Solution | Vineet Chawla, Marisely Urdaneta, and Cesar Verde |
Artificial Lift, Gas Lift | |
| GAS RELEASE SYSTEM BYPASS (GRSB): An Advanced Gas-Handling Technology to Enhance ESP Performance in High-GLR Wells | Talor Nunez, Diamondback Energy |
Artificial Lift, Electric Submersible Pump | |
| High Pressure Gas Lift (HPGL) Upper Completion Design Strategy | Ehab Abo Deeb, Kevin McNeilly, Austin Wheeler, and Martin Lozano |
Artificial Lift, Gas Lift | |
| Hybrid Sucker Rod Pump Mechanical Bottom Lock Seal Ring | Benny Williams, Consultant Q2 ALS |
Artificial Lift, Sucker Rod Pump | |
| Implementing AI POCs and the Advantages of Non-Fixed Stroke Length Rod Pumping Systems | Steven McNeil and Jose Gerardo Villela |
Artificial Lift, Plunger Lift | |
| Improvement and Standardization of Results Using Intelligent Algorithms During the Scanning of Production Pipe and Rods | Enio Oliveros |
General Interest, Computer Applications | |
| Increasing Energy Efficiency of Rod Pump Wells Equipped with PMM and Foresite Power Regenerative System | Luke Hebert, Weatherford |
Artificial Lift | |
| Insights into Intermittent Gas Lift: Lessons from Field Experiments and Operations | Erasmus Mensah and Smith Leggett |
Artificial Lift, Gas Lift | |
| Insights on PRT Analysis: Distinguishing Thermal Drift from Bending | Walter Phillips, WANSCO |
Artificial Lift, Sucker Rod Pump | |
| It's Science, Not Voodoo: Preventing Asphaltenes and Paraffin With Physics Instead of Chemicals Using Enercat | Courtney Richardson and Anthony Allison, Oxy |
Prod. Handling, Scale and Paraffin Treatments | |
| Maximizing Well Production on Tight Casing ESP Applications in the Permian Basin | Irausquin Miguel, Gambus Jorge, Meier Kyle, and Yu Jerry |
Artificial Lift, Electric Submersible Pump | |
| Multifunctional Chemical Remediation Strategies for Wells Impacted by Frac Hits: Field Applications and Performance Outcomes | Rosanel Morales, Camila Tocora, and Martin Campos |
Prod. Handling | |
| Multiphase Flow Metering Approaches: Physics, Field Performance and Test-Separator Comparisons | Jefferson Ogbuka, Bob L. Herd Department of Petroleum Engineering, Texas Tech University |
Prod. Handling | |
| Nitrogen-Driven Pneumatic Instrumentation & Controls: A New Standard for Reliability, Uptime, and Operational Intelligence | John "Bunkie" Westerheide, Kathairos Solutions, Inc. |
General Interest, Environmental | |
| Optimizing Horizontal Well Pumping and BHA Design to Reduce Bottomhole Flowing Pressure | Luke Elbel, Bob L. Herd Department of Petroleum Engineering, Texas Tech University |
Artificial Lift | |
| Overcoming Production Challenges in Oilfields: A Next-Generation Artificial Lift Solution for Complex Well Environments | Tomasz Pacha, Dmytro Nekrasov and Halyna Shcherba, TRIOL- Poland |
Artificial Lift | |
| Ozona and Sonora Canyon Gas Field Revival Turning P&As into P1 Reserves to Help Meet the Massive LNG and Data Center Natural Gas Needs | Robert Barba, Austin Phoenix Resources |
Well Completion and Simulation | |
| Performance Improvements of ESPs using 500 and 700 series PMM in High Demand (High Flow & High HP) applications. | Irausquin Miguel, Gambus Jorge, Meier Kyle, and Yu Jerry |
Artificial Lift, Electric Submersible Pump | |
| Pilot Test for Continuous Production Optimization Using a Digital Solution on Permian Basin Wells | Hardikkumar Zalavadia, Daniel Croce, and Arsalan Adil , Xecta Digital Labs |
General Interest |